1- Electrical, Control & Instrumentation system of  Mashad Power Plant new Cooling Towers.

 

Enduser:
            Khorasan Regional Electrical Company
Progress Percentage:
            100%
Ray Avin Fan Services:
Engineering

Project Description:
The engineering activities for electrical, control and instrumentation phases have been done by Ray Avin Fan company. The major items have been listed as follows:

  • Electrical Network Calculation for cooling fans ,pumps
  • Panel design for Supply & Control of Electrical loads.
  • Design of Lighting, Earthing and lightning protection for cooling towers.
  • Design of control system including PLC and HMI programming for control and monitoring of system fans, motors and pumps and process parameters.
  • Preparing data sheets and specification for Instrument procurement and procurement engineering
  • Design Criteria for controllers and PID setting
  • Site handling and system installation guide and coordinations.

 

2- BEHSHAHR-2 63/20 kV Substation Automation & Protection System

  

Enduser:
            Mazandaran Regional Electric Company
Progress Percentage:
            100%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:
BEHSHAR-2 63/20 kV substation includes two 63kV lines, two 63/20 kV transformers, ten 20kV outgoing feeders.
Automation system of this substation is GE-NESIS of GE Spain and main Relays and Bay Control Units (BUCs) have been supplied from GE Spain and Canada as well. Automatic Voltage Regulators of Power Transformers (AVRs) have been supplied from a-eberle of Germany.
The Automation System is fully redundant and based on Hot and Standby server Scheme. This substation will communicate with Scada Centers via IEC 60870-5-101.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Supervision on SAS and Protection system installation have been done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • Procurement of Ethernet Switches
  • Procurement of Protection and Control panels
  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic design for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Factory acceptance test (FAT)
  • Site acceptance test (SAT) and commissioning.
  • Substation energizing handling & system delivery.

3- Advanced Consultation for Substation Automation System

 

 

Client:
            Tehran Regional Electric Company
Progress Percentage:
            100%
Ray Avin Fan Services:
Consultation

Project Description:
Advanced consultancy for substation automation system of ten 63/20 kV substations in the Tehran province of Iran. Evaluation of SAS technologies, possibility studies, architecture studies, communication with SCADA centers and their protocols studies were in the scope of work.

4- GONBAD-3 63/20 kV Substation Automation & Protection system

 

Enduser:
            Mazandaran Regional Electric Company
Progress Percentage:
            100%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:
GONBAD-3 63/20 kV substation includes two 63kV lines, two 63/20 kV transformers, ten 20kV outgoing feeders.
Automation system of this substation is GE-NESIS of GE Spain and main Relays and Bay Control Units (BUCs) have been supplied from GE Spain and Canada as well. Automatic Voltage Regulators of Power Transformers (AVRs) have been supplied from a-eberle of Germany.
The Automation System is fully redundant and based on Hot and Standby server Scheme. This substation will communicate with Scada Centers via IEC 60870-5-101.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Supervision on SAS and Protection system installation have been done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • Procurement of Ethernet Switches
  • Procurement of Protection and Control panels
  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic design for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Factory acceptance test (FAT)
  • Site acceptance test (SAT) and commissioning.
  • Substation energizing handling & system delivery.

5- SARBANDAR 230/132/33 kV Substation Automation & Protection system

 

Enduser:
            Khuzestan Regional Electric Company
Progress Percentage:
            75%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:
SARBANDAR 230/132/33 kV substation includes two 230kV lines, two 230/132 kV power transformers, two 230/33 kV power transformers, Eight 132kV lines and 14no. 33kV outgoing feeders.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and HDLC (HITACHI) protocols.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • Procurement of Industrial Ethernet Switches
  • Procurement of Fiber optic cables and accessories
  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic design for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Pre-FAT in Germany.
  • Factory acceptance test (FAT) in Iran after panel manufacturing
  • Fiber Optic cabling and splicing
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

6- Caspian 2 multi purpose Tug Boat Electrical, Control & Instrument system installation.

   

Enduser:
            National Iranian Oil Company (NIOC)
Progress Percentage:
           100%
Ray Avin Fan Services:
Installation
Test and Commissioning

Project Description:
The Caspian Sea semisubmersible oil platform has three special tug boats to anchor handling, tugging, supplying the facilities for it. These three tug boats are Hi-tech with strong power to be able to handle the semisubmersible oil platform. The installation of electrical, control, instrumentation and communication equipment of the second tugboat is done by Ray Avin Fan company. The major items will be listed in the following:

  • Mechanical installation of MCT frames, cable tray/ladder/conduits, supports for lighting fixtures, socket and switches, field instruments, wall mounted and standalone electrical cabinets and consoles and other equipment.
  • Cable laying and forming including hi-voltage test for power cables and loop check for I&C cables.
  • Cable connection including: forming the cable in panels, fixing of glands, cable shoes, varnishes and wire numbers
  • Earth connections
  • Tag connections
  • MCT module installation and forming
  • Cooperation in commissioning

7- YASOUJ 400/132/20 kV Substation Automation & Protection System

 

Enduser:
            Iran Power Development Company (IPDC)
Progress Percentage:
           95%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:
Yasouj 400/132/20 kV substation includes two 400kV lines, two 400/132/20 kV power transformers, Six 132kV lines.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and HDLC (HITACHI) protocols.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • Procurement of Industrial Ethernet Switches
  • Procurement of Fiber optic cables and accessories
  • Basic design substation Protection.
  • Basic design substation Control.
  • Basic design SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Pre-FAT in Germany.
  • Factory acceptance test (FAT) in Iran after panel manufacturing
  • Fiber Optic cabling and splicing
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

8- NGSDH and Access system and Fiber optic Telecommunication  Link Between Damavand Power Plant and Rey Power Plant

 

       

 

Enduser:
            Iran Power Development Company (IPDC)
Progress Percentage:
            100%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning
Training

Project Description:
Qualification and awarding this project through tendering procedure and investigation to prepare required optical fiber communication system for Damavand Power Plant as the biggest Power Plant in Middle East, is one of our brilliant successes in our done projects as well.
At the time of project this project was very important and in top urgent classification and we could complete our scope of work very earlier than others. As soon as completion of other companies scope of work in passive parts of projects our system start to work and from that time it is in service.
Very soon this point became one of the most important communication nodes based on its place of work that is one of critical communication bottle necks in TAVANIR. Nowadays all traditional communication traffic for PABX and PLC (Power Line Carrier) systems at that area is supported by prepared required interfaces with installed system such as Djalal Substation PAX connection up to Social Operation Center, same for Ahowan Substation including its DTS, required SOC data transfer through Analog Modems received from PLC system, Preparing required Data Tunnel to support Ethernet network to build WAN in cooperation with Tehran Regional Electrical Co. in Sadat Abad Building that support both  their computer network and internet, Forwarding all SCADA data to SOC from Damavand P.P and 400KV substation, Ahowan 400 KV Substation and Damghan 400KV Substation.
On time activities and good project management make end user to award us official letter about our good performance action.
Specification:

  • STM-1 NG-SDH
  • Access
    • FXO ab wire port
    • FXS ab wire port
    • E1 G703 port
    • Ethernet/Fast Ethernet 10/100 BaseT peer to peer connection port
    • E&M 4/6 wire port suitable for usage as trunk between central units, Analogue Modem connection, Power Line Carrier system (PLC), DTS
    • Rectifier Charger and batteries in -48VDC
    • Supplying required spare parts

9- Electrical Bulk Material for Jahan Vegeterian Edible Oil Complex

             

 

Enduser:
            Jahan Vegeterian Edible Oil Complex
Progress Percentage:
            100%
Ray Avin Fan Services:
Procurement

Project Description:
Procurement of Electrical Bulk Material for CMB S.p.a of Italy.

10- SARI 230/63 kV Substation Automation & Protection System

 

Enduser:
            Iran Power Development Company (IPDC)
Progress Percentage:
            100%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning
Project Description:
Sari 230/63 kV substation includes two 230kV lines, 2 230/63/20 kV power transformers, Eight 63kV lines.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and Indactic 2033 protocols.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • Procurement of Industrial Ethernet Switches
  • Procurement of Fiber optic cables and accessories
  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic design for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Pre-FAT in Germany.
  • Factory acceptance test (FAT) in Iran after panel manufacturing
  • Fiber Optic cabling and splicing
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

11- Electrical, Control and Instrumentation of LPG and  MTBE facilities at Neka Oil Jetty

             

Enduser:
            National Iranian Oil Engineering and Construction Co.
Progress Percentage:
            100%
Ray Avin Fan Services:
Installation
Site Acceptance and Commissioning

Project Description:
The facilities shall be constructed in order to receive LPG transported by sea vessels of 2500 ton capacity and also by road tankers, using marine and road tanker loading/unloading arms. LPG will be loaded into spherical tanks through marine arms at the rate of 800 m3/hr and through road tanker arms at the rate of 80m3/hr. Separate metering facilities shall be installed for marine and road tanker loading. The LPG facilities shall be equipped with all the necessary safety systems. The main buildings include the guardhouses, office building, control room, fire fighting building, canteen, shelters etc.
The main Ray Avin FAN activities in brief:

  • Installation, Test and Commissioning of Medium Voltage and Low voltage panels
  • Installation, Test and Commissioning of Fire detection system
  • Installation, Test and Commissioning of Cathodic Protection system
  • Installation, Test and Commissioning of Explosion proof equipments
  • Installation, Test and Commissioning of Lighting system
  • Installation, Test and Commissioning of Earthing System
  • Installation, Test and Commissioning of Oil and Gas flow metering and billing system
  • Test and Commissioning of DCS system
  • Power and Instrumentation cabling
  • Calibration of Instruments
  • Installation, Test and Commissioning of Instruments
  • Test and Commissioning of Loop circuits
  • Test and Commissioning of Process logic
  • Test and Commissioning of Protection system
  • High voltage test of power cables
  • Test of Fire detection, Cathodic system cables

12- CHENAR SHAHIJAN 400 kV Substation Extension Protective Relays

 

Enduser:
            Iran Power Development Company (IPDC)
Progress Percentage:
            100%
Ray Avin Fan Services:
Procurement
Project Description:
Chenar Shahijan 400 kV substation Extension includes Two 400kV lines.
Protective relays are supplied from Siemens.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays.

 

13- Power Management System (PMS) and Process monitoring of Kermanshah Sewage Treatment Facilities

 

Enduser:
Kermanshah Water and Sewage Water Company
Progress Percentage:
            100%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Site Acceptance and Commissioning

Project Description:
The main Ray Avin FAN activities in brief:

  • Procurement of PLC equipment based on Siemens S7 product series
  • Procurement of Control system software
  • Procurement of Panels
  • Engineering of Power management system
  • Engineering of Pump station and Sewage water treatment process
  • Factory Acceptance test
  • Site Acceptance test and Commissioning

14- OPGW installation over Live and Dead 400 kV Line from Taghideezaj Substation  to Azarbayjan Border

                             

Enduser:
            Iran Power Development Company (IPDC)
Progress Percentage:
            100%+25%
Ray Avin Fan Services:
Partial Procurement
Live line installation
Dead line installation
Test and Commissioning

Project Description:
Installation of Optical Guard Wires over 150 km of 400kv line with metal lathetic and none metal towers between Ardebil(Sabalan) power plant and Azerbaijan border in fully outage condition was the scope of work.
Based on tight time schedule for installation and many difficulties to prepare required outages we prepare a letter to suggest our client to let us to work in Live Line condition and Install OPGW over all crossings with 20kv, 63kv, 230kv and 400kv lines.
With our client acceptance and preparing required permit we start to work in Live Line  condition and succeed to complete our scope of work before due date. In this regards the client issues attached official letter of our good performance activities also.   
 Specification:
Installation Single layer OPGW 10.5 mm overall diameter with NZDSF fibers in both getting outage and Live parts of HV Lines
 Services:
 Procurement required: OCDF, Direct Burial Optical Cable, Pigtail
Commissioning
Provisional Acceptance Test and Final acceptance test

15- Yazd Mobile 132-63/20 kV Substation Automation & Protection System

          

Enduser:
            Yazd Regional Electric Company
Progress Percentage:
           100%
Ray Avin Fan Services:
Engineering
Factory Acceptance Test
Site Acceptance and Commissioning

Project Description:
Yazd Mobile 132-63/20 kV substation has been design for connection to two different voltage levels, 132 kV and 63 kV. The Power transformer of substation has an off-load tap changer in the Primary side of transformers which it creates the capability of connection of substation to mentioned voltage levels. The incomings and outgoings breaker of 20 kV section are Pole mounted Recloser from Wipp & Bourne Co. of England.  This substation includes one 132 (63) kV line, one 132 (63)/20 kV Power transformer and four 20 kV outgoing.
Automation system of this substation is GE-NESIS of GE Spain and main Relays and Bay Control Units (BUCs) have been supplied from GE Spain and Canada as well. Automatic Voltage Regulators of Power Transformers (AVR) have been supplied from a-eberle of Germany.
The Automation System is single.
All Design, Factory Acceptance test (SAT), Site acceptance test (SAT), Supervision on SAS and Protection system installation have been done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic design for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Factory acceptance test (FAT)
  • Site acceptance test (SAT) and commissioning.
  • Substation energizing handling & system delivery.

16- Khuzestan Steel Co. Meltshop Extension Project #274 & #277 Cooling Towers

 1   

End user:
            Khuzestan Steel Company
Progress Percentage:
            100%
Ray Avin Fan Activities:
Engineering
Project Description:

In order to increase the volume of product (2’200’000Tons/Year) in Khuzestan Steel Company, #277 and # 274 cooling towers are respectively established and revamped to fulfill the required circulating water through Electric Arc Furnaces. Load demand of the electrical equipment in the area of C.T. #277 is supplied from two 6.6 kV feeders each with the total capacity of 800A. For feeding the 400V consumers, two 3000kV power transformers, which are fed from the new C.T. #277 6.6kV switchgears, supply all low voltage electrical consumer of unit. The revamping of the C.T. #274 caused adding a new low voltage transformer and resizing of the medium voltage and low voltage main pumps. Accordingly, resizing of the motors to the greater size and making some small additional load in low voltage switchgear. This company has done the designs engineering and tendering bid evaluation in electrical, control and instrumentation fields. The major scopes are specified as following:

  • Electrical network calculation (load flow – motor starting – short circuit calculation).
  • Preparing data sheets and specification for medium voltage switchgears and low voltage MCCs.
  • Doing transformer sizing and preparing data sheets and specification.
  • Preparing cable sizing, schedules, lists, specifications and layouts and routes.
  • Preparing lighting calculation, data sheets, specification, MTO and layout.
  • Preparing earthing calculation, data sheets, specification, MTO and layout.
  • Preparing busduct isometric drawings, data sheets, specification. 
  • Control system designing based on PLC, HMI programming for control and monitoring of system parameters.
  • Preparing data sheets and specification for Instrument procurement and procurement engineering.
  • Equipment installation guide, coordination of electrical installation with other parts.
  • Preparing data sheets and specification for instrument procurement and procurement engineering. Preparing layouts and hook up diagrams for installation of instruments.
  • Preparing IO lists, PLC specification also control cabinets schematic diagrams to purchase control system and procurement engineering.
  • Preparing control philosophies, logic diagrams and programs for PLC and HMI up to commissioning.
  • Preparing cable schedules, lists, specifications and lay outs and routes.
  • Preparing layouts and hook up diagrams for installation of instruments.
  • Preparing loop diagrams and cable connection tables for installation and maintenance.
  • Preparing system commissioning manual, operation manual and maintenance manual.

17- RUDESHUR 400 kV Power Plant  Substation Automation System

  

Enduser:
            SIEMENS Power Generation
Progress Percentage:
            100%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:
RUDESHUR 400 kV Power Plant substation is a BOT (Buy Operation Transfer) and is a private Power Plant. Phase one of the project is included 3 Power Plant Feeder, 2 over head line feeders.
Automation system of this substation is TG820L of Siemens Switzerland.
The Automation section including all related engineering activities and commissioning like Hardware test, Software test, logic, GPS settings and Tele Communication test have been done by Ray Avin Fan.
The main activities in this project are as following:

  • Procurement of HOST computers.
  • Programming, Picture generation, logic & data base generation for TG820L (Siemens Switzerland).
  • Review of Basic documents for substation Protection.
  • Review of Basic documents for substation Control.
  • Review of Basic documents for SAS Communication scheme and Numerical Control.
  • Review of Detail design for substation control.
  • Review of Detail design for substation protection.
  • Logic & Interlocking generation in BCUs.
  • Factory acceptance test (FAT)
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

18- Revamping project for Electrical & Automation of Khouzestan Steel Company Direct Reduction Unit  No.II

 

Enduser:
            Khuzestan Steel Company
Progress Percentage:
           100%
Ray Avin Fan Services:
Engineering

Project Description:
Revamping and using new technology of Industrial power supply and monitoring is the main goal of this project.
The Existing control system was completely old and out of date. The same condition was also for MCC and Power supply system.
Feeding electrical energy and also monitoring of system is vital for such industrial plants and is the first action of Khuzestan steel company to renew and revamping the plant. The major activities for Ray Avin Fan are as following:

  • Full evaluating system electrical & control condition by site visiting for preparing comprehensive plant report.
  • Proposal new 6.6kV/400V Single line diagram.
  • Proposal new DC Single line diagram.
  • Proposal new emergency Diesel generator system.
  • Proposal PMS system.
  • Proposal of new Control system and philosophy by the most update PLC & Controllers.
  • System Analysis.
    • New load flow analysis.
    • New Short circuit calculation & fault current analysis.
    • New motor starting calculation.
    • New cable & bus duct sizing calculation.
    • New transformer sizing calculation.
    • New UPS, Battery charger and lighting calculation.
  • New Electrical MV, MCC,PLC circuit diagrams.
  • New Control/Electrical layouts.
  • New system standard SIL analysis.
  • New logic diagram for PLCs and HMI.

19- Ghaen 400 kV Power Plant Substation Automation & Protection system

   

Enduser:
            Iran Power Development Company (IPDC)
Progress Percentage:
           100%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

Ghaen 400 kV Power Plant substation located in south of  Khorasan Province. This substation includes four generator feeders, six over head lines. Automation system of this substation is TG820L of Siemens Switzerland, Bay Control Units (BUCs) are from Siemens Switzerland and main Relays are supplied from Siemens Germany. This substation will communicate with Scada Centers via IEC 60870-5-101.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • Procurement of Protection and Control panels.
  • Procurement of Fiber optic cables and accessories
  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic documents for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Pre-FAT in Switzerland.
  • Factory acceptance test (FAT) in Iran after panel manufacturing
  • Fiber Optic cabling and splicing
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

20- OPGW installation over Live 400 kV Line from Choghadak Substation  to  Omidiyeh II Substation and from Omidiyeh II to Karoun III Substation

      

Enduser:
            Iran Power Development Company (IPDC)
Progress Percentage:
            100%+20%
Ray Avin Fan Services:
Partial Procurement
Repairing already installed parts in older sections
Full Live line installation of new section
Test and Commissioning
Project Description:
Full Live Line Installation of Optical Guard Wires over 120 km of 400kv line with metal lathetic between Chogadak SS and Omidiyeh II SS as first section and Omidiyeh II - Karoun III as second section.
We complete first step of contract and start site mobilization and are waiting for required permit to start our activities.
Specification:
Installation two layer OPGW 15mm overal diameter and Single layer OPGW 12 mm overall diameter with NZDSF fibers in Live 400kv HV Lines
Services:
 Procurement required OCDF, Direct Burial Optical Cable, Pigtail
Commissioning
Provisional Acceptance Test and Final acceptance test

   

21- ESFAHAN STEEL (ZOBEAHAN) 63/10.5 kV Substation Automation & Protection System

         

Enduser:
            Esfahan Steel Co.
Progress Percentage:
           95%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning
Project Description:
Esfahan Steel  63/10.5 kV substation includes two 63/10.5 kV Power transformers, four 10.5 kV incomings and 26 no. 10.5 kV Outgoings.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 protocol.
All Design, partial Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protection and Control panels.
  • Procurement of Industrial Computers.
  • Procurement of Fiber optic cables and accessories
  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic design for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Pre-FAT in Germany.
  • Factory acceptance test (FAT) in Iran after panel manufacturing
  • Fiber Optic cabling and splicing
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

22- KABUL NORTH (AFGHANISTAN) 110/20 kV Substation Automation & Protection System

 

Enduser:
            Islamic Republic of Afghanistan, Ministry of Energy
Progress Percentage:
           80%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning
Project Description:
North Kabul  110/20 kV substation includes four 110 kV Lines, two 110/20 kV Power transformers and 14no. 20 kV Outgoings.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 protocol.
All Design, partial Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protection and Control panels.
  • Procurement of Industrial Computers.
  • Procurement of Fiber optic cables and accessories
  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic design for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Pre-FAT in Germany.
  • Factory acceptance test (FAT) in Iran after panel manufacturing
  • Fiber Optic cabling and splicing
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

23- ESFAHAN STEEL (ZOBEAHAN) 230/63 kV Substation Automation & Protection System

      

Enduser:
            Esfahan Steel Co.
Progress Percentage:
           80%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning
Project Description:
Esfahan Steel  63 kV substation (63 kV voltage level is in the scope of work) includes 20 no. 63 kV feeders.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 protocol.
All Design, partial Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protection and Control panels.
  • Procurement of Industrial Computers.
  • Procurement of Fiber optic cables and accessories
  • Basic design for substation Protection.
  • Basic design for substation Control.
  • Basic design for SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Pre-FAT in Germany.
  • Factory acceptance test (FAT) in Iran after panel manufacturing
  • Fiber Optic cabling and splicing
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

24-NGSDH and Access system and Fiber optic Telecommunication  Link Between Ardebil(Sabalan) Power Plant and Taghidizaj Substation

 
Enduser:
            Iran Power Development Co.- Azarbayejan Regional Electric Co.
Progress Percentage:
           100%+25%
Ray Avin Fan Services:
Engineering
Procurement
Construction
Factory Acceptance Test
Commissioning
Training

Project Description:
This project has same characteristics to our older project in Damavand in scope of work and end user requirements and also is in contract negotiations and exchange stage now.
Specification:

  • STM-1 NG-SDH
  • Access
    • FXO ab wire port
    • FXS ab wire port
    • E1 G703 port
    • Ethernet/Fast Ethernet 10/100 BaseT peer to peer connection port
    • E&M 4/6 wire port suitable for usage as trunk between central units, Analogue Modem connection, Power Line Carrier system (PLC), DTS
    • Rectifier Charger and batteries in -48VDC

25- OPGW installation over Live 230 kV Line from Khoy PP to  Orumiyeh II Substation and from Orumiyeh II substation to Orumiyeh PP

          

    Enduser:
              Iran Power Development Co.- Azarbayejan Regional Electric Co.
    Progress Percentage:
               100%
    Ray Avin Fan Services:
    Partial Procurement
    Reforming existing GW cross arms to be able to adjust them to new OPGW accessories
    Full Live line installation
    Test and Commissioning
    Project Description:
    Full Live Line Installation of Optical Guard Wires over 167 km of 230kv line with 59 metal lathetic towers and 510 concreat towers between Khoy PP to  Orumiyeh II Substation as first part and from Orumiyeh II substation to Orumiyeh PP as second part
    The progress in first part considering of completion of second part with 69 towers is around 62% and estimated time for total completion is less than one month.
    Specification:
    Installation Single layer OPGW 12 mm overall diameter with NZDSF fibers in Live 230kv HV Lines
    Services:
     Procurement required accessories
    Commissioning
    Provisional Acceptance Test and Final acceptance test

26- MIYANEH 400/230/60/20 kV Substation Automation & Protection System

 

Enduser:
           Azarbayejan Regional Electric Co.
Progress Percentage:
           50%
Ray Avin Fan Services:
Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:
Miyaneh 400/230/60/20 kV substation includes three 400kV lines, one 400/230 kV power transformer, one 400/230 kV power transformer, four 230kV lines and four 63kV lines.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and HDLC (HITACHI) protocols.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • Procurement of Industrial Ethernet Switches
  • Procurement of Fiber optic cables and accessories
  • Basic design substation Protection.
  • Basic design substation Control.
  • Basic design SAS Communication scheme and Numerical Control.
  • Detail design for substation control.
  • Detail design for substation protection.
  • BCU & Protection Relay Configuration.
  • Data Base generation for Numerical control system.
  • Picture generation for Numerical control System.
  • Logic & Interlocking generation in BCUs.
  • Pre-FAT in Germany.
  • Factory acceptance test (FAT) in Iran after panel manufacturing
  • Fiber Optic cabling and splicing
  • Site acceptance test (SAT) and commissioning.
  • SCADA connection engineering and remote telecommunications.
  • Substation energizing handling & system delivery.

    27- SIHBISHE 400 kV Power Plant GIS Substation Automation & Protection system
     
    Enduser:
                Tehran Regional Electric Company
    Progress Percentage:
              5%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    SIHBISHE 400 kV substation includes three 400kV lines and three 400 kV power plant feeder.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and Inductic2033 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

    • Procurement of all Protective Relays, Bay Control Units, Automation system software
    • Procurement of Industrial Ethernet Switches
    • Procurement of Fiber optic cables and accessories
    • Basic design for substation Protection.
    • Basic design for substation Control.
    • Basic design for SAS Communication scheme and Numerical Control.
    • Detail design for substation control.
    • Detail design for substation protection.
    • BCU & Protection Relay Configuration.
    • Data Base generation for Numerical control system.
    • Picture generation for Numerical control System.
    • Logic & Interlocking generation in BCUs.
    • Pre-FAT in Germany.
    • Factory acceptance test (FAT) in Iran after panel manufacturing
    • Fiber Optic cabling and splicing
    • Site acceptance test (SAT) and commissioning.
    • SCADA connection engineering and remote telecommunications.
    • Substation energizing handling & system delivery.

    28- MAHDIS 230/33 kV Substation Automation & Protection System
     
    Enduser:
               Khuzestan Regional Electric Co.
    Progress Percentage:
               5%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    Mahdis 230/33 kV substation includes two 230kV lines, two 230/33 kV power transformers, two33 kV capacitor feeders and  fourteen 33kV outgoings.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101, IEC 60870-5-104 and HDLC (HITACHI) protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

    • Procurement of all Protective Relays, Bay Control Units, Automation system software
    • Procurement of Industrial Ethernet Switches
    • Procurement of Fiber optic cables and accessories
    • Basic design substation Protection.
    • Basic design substation Control.
    • Basic design SAS Communication scheme and Numerical Control.
    • Detail design for substation control.
    • Detail design for substation protection.
    • BCU & Protection Relay Configuration.
    • Data Base generation for Numerical control system.
    • Picture generation for Numerical control System.
    • Logic & Interlocking generation in BCUs.
    • Pre-FAT in Germany.
    • Factory acceptance test (FAT) in Iran after panel manufacturing
    • Fiber Optic cabling and splicing
    • Site acceptance test (SAT) and commissioning.
    • SCADA connection engineering and remote telecommunications.
    • Substation energizing handling & system delivery.

     29- NGSDH and Access system and Fiber optic Telecommunication  Link Between Khoramshahr Power Plant and Abadan Milad Substation

           

    Enduser:
                Iran Power Development Company (IPDC)
    Progress Percentage:
               100%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Training
    Project Description:
    Project Description:
    This project has same characteristics to our older project in Damavand in scope of work and end user requirements and also is in contract negotiations and exchange stage now.
    Specification:

    • STM-1 NG-SDH
    • Access
      • FXO ab wire port
      • FXS ab wire port
      • E1 G703 port
      • Ethernet/Fast Ethernet 10/100 BaseT peer to peer connection port
      • E&M 4/6 wire port suitable for usage as trunk between central units, Analogue Modem connection, Power Line Carrier system (PLC), DTS
      • Rectifier Charger and batteries in -48VDC

    30- BANDAR ABBAS 230/63 kV GIS Substation Automation & Protection System


     Bandar Abbas SSIEC 61850
    Enduser:
                Hormozgan Regional Electric Co.
    Progress Percentage:
              15%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    Bandar abbas 230/63 kV substation includes four 230kV lines, two 230/63kV power transformers, four 63kV lines and 63 kV cable feeders.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and Hitachi (HDLC) protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

    • Procurement of all Protective Relays, Bay Control Units, Automation system software
    • Procurement of Industrial Ethernet Switches
    • Procurement of Fiber optic cables and accessories
    • Basic design for substation Protection.
    • Basic design for substation Control.
    • Basic design for SAS Communication scheme and Numerical Control.
    • Detail design for substation control.
    • Detail design for substation protection.
    • BCU & Protection Relay Configuration.
    • Data Base generation for Numerical control system.
    • Picture generation for Numerical control System.
    • Logic & Interlocking generation in BCUs.
    • Pre-FAT in Germany.
    • Factory acceptance test (FAT) in Iran after panel manufacturing
    • Fiber Optic cabling and splicing
    • Site acceptance test (SAT) and commissioning.
    • SCADA connection engineering and remote telecommunications.

    Substation energizing handling & system delivery.
    31-NGSDH and Access system and Fiber optic Telecommunication  Link Between Kashan Power Plant and Kashan Ravand Substation
     
    Enduser:
                Iran Power Development Co.
    Progress Percentage:
              100%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Construction
    Factory Acceptance Test
    Commissioning
    Training

    Project Description:
    This project has same characteristics to our older project in Damavand in scope of work and end user requirements and also is in contract negotiations and exchange stage now.
    Specification:

    • STM-1 NG-SDH
    • Access
      • FXO ab wire port
      • FXS ab wire port
      • E1 G703 port
      • Ethernet/Fast Ethernet 10/100 BaseT peer to peer connection port
      • E&M 4/6 wire port suitable for usage as trunk between central units, Analogue Modem connection, Power Line Carrier system (PLC), DTS
      • Rectifier Charger and batteries in -48VDC

    32- MAYAMI 400/63 kV Substation Automation & Protection System
     
    Enduser:
               Semnan Regional Electric Co.
    Progress Percentage:
               10%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    Mayami 400/63 kV substation includes two 400kV lines, two 400/63 kV power transformers and six 63kV lines.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and HDLC (HITACHI) protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

    • Procurement of all Protective Relays, Bay Control Units, Automation system software
    • Procurement of Industrial Ethernet Switches
    • Procurement of Fiber optic cables and accessories
    • Basic design substation Protection.
    • Basic design substation Control.
    • Basic design SAS Communication scheme and Numerical Control.
    • Detail design for substation control.
    • Detail design for substation protection.
    • BCU & Protection Relay Configuration.
    • Data Base generation for Numerical control system.
    • Picture generation for Numerical control System.
    • Logic & Interlocking generation in BCUs.
    • Pre-FAT in Germany.
    • Factory acceptance test (FAT) in Iran after panel manufacturing
    • Fiber Optic cabling and splicing
    • Site acceptance test (SAT) and commissioning.
    • SCADA connection engineering and remote telecommunications.
    • Substation energizing handling & system delivery.

    33- Bandar Anzali Free zone 63/20 kV GIS Substation Automation & Protection System
     _ _
    Enduser:
               Gilan Regional Electric Co.
    Progress Percentage:
               2%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    Bandar Anzali Free zone 63/20 kV GIS substation includes two 63kV lines, two 63/20 kV power transformers, 20 no 20 kV Outgoings feeder, 4 no 20 kV Capacitor feeder and One 20 kV Bus section.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and IEC 60870-5-104 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • Procurement of Industrial Ethernet Switches
      • Procurement of Fiber optic cables and accessories
      • Basic design substation Protection.
      • Basic design substation Control.
      • Basic design SAS Communication scheme and Numerical Control.
      • Detail design for substation control.
      • Detail design for substation protection.
      • BCU & Protection Relay Configuration.
      • Data Base generation for Numerical control system.
      • Picture generation for Numerical control System.
      • Logic & Interlocking generation in BCUs.
      • Pre-FAT in Germany.
      • Factory acceptance test (FAT) in Iran after panel manufacturing
      • Fiber Optic cabling and splicing
      • Site acceptance test (SAT) and commissioning.
      • SCADA connection engineering and remote telecommunications.
      • Substation energizing handling & system delivery.

    34- Mohtasham Kashani 230/63/20 kV Substation Automation & Protection System
    _ _
    Enduser:
               Esfahan Regional Electric Co.
    Progress Percentage:
               20%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    Mohtasham kashani 230/63/20 kV substation includes two 230kV lines, two 230/63/20 kV power transformers and  12 no 63kV Lines.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101, Inductic2033 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • Procurement of Industrial Ethernet Switches
      • Procurement of Fiber optic cables and accessories
      • Basic design substation Protection.
      • Basic design substation Control.
      • Basic design SAS Communication scheme and Numerical Control.
      • Detail design for substation control.
      • Detail design for substation protection.
      • BCU & Protection Relay Configuration.
      • Data Base generation for Numerical control system.
      • Picture generation for Numerical control System.
      • Logic & Interlocking generation in BCUs.
      • Pre-FAT in Germany.
      • Factory acceptance test (FAT) in Iran after panel manufacturing
      • Fiber Optic cabling and splicing
      • Site acceptance test (SAT) and commissioning.
      • SCADA connection engineering and remote telecommunications.
      • Substation energizing handling & system delivery.

    35- Rasht-2 63/20 kV GIS Substation Automation & Protection System

     _ _
    Enduser:
               Gilan Regional Electric Co.
    Progress Percentage:
               2%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    Rasht-2 63/20 kV GIS substation includes two 63kV lines, two 63/20 kV power transformers, 20 no 20 kV Outgoings feeder, 4 no 20 kV Capacitor feeder and One 20 kV Bus section.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and IEC 60870-5-104 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • Procurement of Industrial Ethernet Switches
      • Procurement of Fiber optic cables and accessories
      • Basic design substation Protection.
      • Basic design substation Control.
      • Basic design SAS Communication scheme and Numerical Control.
      • Detail design for substation control.
      • Detail design for substation protection.
      • BCU & Protection Relay Configuration.
      • Data Base generation for Numerical control system.
      • Picture generation for Numerical control System.
      • Logic & Interlocking generation in BCUs.
      • Pre-FAT in Germany.
      • Factory acceptance test (FAT) in Iran after panel manufacturing
      • Fiber Optic cabling and splicing
      • Site acceptance test (SAT) and commissioning.
      • SCADA connection engineering and remote telecommunications.
      • Substation energizing handling & system delivery.

     

    36- Paknejad 63/20 kV GIS Substation Automation & Protection System

     _ _
    Enduser:
               Yazd Regional Electric Co.
    Progress Percentage:
               2%
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    Paknejad 63/20 kV GIS substation includes two 63kV lines, two 63/20 kV power transformers, 12 no 20 kV Outgoings feeder, 2 no 20 kV Capacitor feeder and One 20 kV Bus section.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and IEC 60870-5-104 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • Procurement of Industrial Ethernet Switches
      • Procurement of Fiber optic cables and accessories
      • Basic design substation Protection.
      • Basic design substation Control.
      • Basic design SAS Communication scheme and Numerical Control.
      • Detail design for substation control.
      • Detail design for substation protection.
      • BCU & Protection Relay Configuration.
      • Data Base generation for Numerical control system.
      • Picture generation for Numerical control System.
      • Logic & Interlocking generation in BCUs.
      • Pre-FAT in Germany.
      • Factory acceptance test (FAT) in Iran after panel manufacturing
      • Fiber Optic cabling and splicing
      • Site acceptance test (SAT) and commissioning.
      • SCADA connection engineering and remote telecommunications.
      • Substation energizing handling & system delivery.

    37- Mianeh 63/20 kV Substation Extension Automation & Protection System

     _ _
    Enduser:
               Azarbayjan Regional Electric Co.
    Progress Percentage:
               Contract negotiation
    Ray Avin Fan Services:
    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning
    Project Description:
    Extension to Mianeh 63/20 kV substation includes one 63/20 kV power transformer, 6 no 20 kV Outgoings feeder, and One 20 kV Bus section.

    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 protocol.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • Procurement of Industrial Ethernet Switches
      • Procurement of Fiber optic cables and accessories
      • Basic design substation Protection.
      • Basic design substation Control.
      • Basic design SAS Communication scheme and Numerical Control.
      • Detail design for substation control.
      • Detail design for substation protection.
      • BCU & Protection Relay Configuration.
      • Data Base generation for Numerical control system.
      • Picture generation for Numerical control System.
      • Logic & Interlocking generation in BCUs.
      • Pre-FAT in Germany.
      • Factory acceptance test (FAT) in Iran after panel manufacturing
      • Fiber Optic cabling and splicing
      • Site acceptance test (SAT) and commissioning.
      • SCADA connection engineering and remote telecommunications.
      • Substation energizing handling & system delivery.

38-NGSDH and Access system and Fiber optic Telecommunication  Link Between Aliabad Power Plant and   Substation
 
Enduser:
            Iran Power Development Co.
Progress Percentage:
Contract negotiation.
Ray Avin Fan Services:
Engineering
Procurement
Construction
Factory Acceptance Test
Commissioning
Training

Project Description:
This project has same characteristics to our older project in Kashan in scope of work and end user requirements and also is in contract negotiations and exchange stage now.
Specification:

        • STM-1 NG-SDH
        • Access
          • FXO ab wire port
          • FXS ab wire port
          • E1 G703 port
          • Ethernet/Fast Ethernet 10/100 BaseT peer to peer connection port
          • E&M 4/6 wire port suitable for usage as trunk between central units, Analogue Modem connection, Power Line Carrier system (PLC), DTS
          • Rectifier Charger and batteries in -48VDC

39- SHFA  63/20 kV Substation Extension Protective Relays
_
Enduser:
            Azarbayjan Regional Electric Co.
Progress Percentage:
            5%
Ray Avin Fan Services:
Procurement
Project Description:

Protective relays are supplied from Siemens.
The main Ray Avin FAN activities in brief:
Procurement of Protective Relays.

Date of last update: June 19,2009
 
 
                                